Pump Rotor and Stator for MONO Progressive Cavity Pump Replacement
Professional replacement rotor and stator components designed for MONO progressive cavity pumps, ensuring optimal performance and longevity.
Production Process
Product Specifications
| Category |
Details |
| Spare Parts |
- Pump casing, Casing cover, Impeller, Expeller, Side plate, Shaft, Bearing cover
- Labyrinth ring, GAMMA seal deflector, Packing seal, Isolator
- Exchange unit assembly, Bearing unit service kit, Dynamic seal service kit, Vent device, Oil breath, Seal water equipment SWE
|
| Reverse-Engineering |
FARO 3D Laser Scanning, Laser Alignment, Design model, Computational Fluid Dynamics CFD |
| Material Standards |
ASTM, ANSI, SAE, UNS, DIN, EN, ISO, TOCT including Cast iron, Wear-resistant cast iron, Cast steel, Stainless steel, Duplex SS, Cast alloy steel |
| Mould and Casting |
Investment casting mould, Sand casting mould. Investment Casting process includes: Wax injection, Clusters assembly, Coating & Sanding, Dewaxing, Casting, Post cleaning, Heat treatment, Inspection |
| Manufacturing Processes |
CNC machining, Auto lathe machining, Meter lathe machining, Wire cutting, EDM cutting, Grinding, Milling, Drilling, Screwing, Cutting, Stamping |
| Surface Treatment |
Blacking, Polishing, Anodize, Chrome plating, Zinc plating, Nickel plating or other as requirements |
| Quality Inspection |
Material certificate, Hydrostatic testing, Impeller static & dynamic balancing testing, Non-destructive testing (PT/RT/UT/MT), 3D coordinator, Hardness tester, Roughness tester |
| Certifications |
ISO9001:2015, ISO14001:2004, API Specification Q1 |
| Packing |
- Small parts: individually packed in paper cartons
- Wooden crates suitable for sea shipping
- Custom packaging available based on customer requirements
|
| Delivery Time |
30 days after receiving deposit |
| Payment Terms |
70% TT in advance, balance paid against copy of B/L |
| Transportation Methods |
Express, Sea freight, Air shipping, Land transport, Post |
Company Profile & Services
DONGGUAN HydroBlue is a professional provider of comprehensive technical solutions in fluid machinery, fluid engineering, industrial equipment automation, and frequency converters.
Technical Expertise
Our team includes 8 professional technical talents specializing in fluid engineering, electrical engineering, and electronic engineering.
University Partnerships
- Collaboration with Jiangsu University National Research Center of Pumps for hydraulic model design, flow numerical simulation, and intelligent energy-saving technology research
- Partnership with Chinese Academy of Sciences for specialized coating technology to meet exclusive corrosion and wear resistance requirements
- Cooperation with Guangdong University of Technology for industrial control and drive systems including industrial intelligent equipment and frequency converters
Our Brands & Services
We provide professional overall technical solutions in fluid machinery and engineering, industrial control and drive equipment, mechanical seals, and overseas field engineering solutions.
Comprehensive Solutions
- Pumps, frequency converters, servo drives, PLC servo drives HMI
- Industrial control cabinets, motors, reduced motors
- Mechanical seals and systems, couplings, gearboxes
- Engineering solutions including 3D scanning reverse molding of pump replacement parts
- Overseas on-site equipment debugging services by dispatched engineers
Packing & Transportation
Frequently Asked Questions
Q: Are you a factory or a trading company?
A: We are a professional service provider of customized complete solutions in the field of fluid machinery and fluid engineering.
Q: What are your payment methods?
A: L/C, T/T, D/P, PayPal, Western Union, and small-amount payment options.
Q: What about packaging?
A: Standard export packaging with polywood boxes for secure transportation.
Q: How about the delivery time?
A: 30-90 days, depending on quantity and season.
Q: What is the minimum order quantity?
A: 1 set minimum order quantity.
Q: How about the quality guarantee?
A: One year after commissioning or 18 months after delivery.